04 September 2020

Conservatory Design & Build - Part 2 - Enabling Works

Following on directly from our Part 1 post, we've been continuing with the enabling works for the new conservatory.

The photo diary continues ...

the old guttering arrangement above my office door, 
also fed with a downpipe from the main roof

the new arrangement - a galvanised C-section purlin now carries the water to 
a tundish at the RH end. A second length of purlin below makes a face
 between them to add a board.   This board and the timber post structure on 
the right will provide a flat interface for the end of the conservatory to butt up against.